A 233-acre wooded tract at 4400 Old US Highway 1 in western Wake County: master subdivision approved by the Town of Apex in September 2021, construction drawings for phases 1, 2 and 3A signed by the Town in November 2025, and a reported sale to a national home builder in February 2026. JMS's posts of October 2025 show three large culvert crossings on the site. Confirm site, client and scope with JMS
February 2025The tract before clearing, state 6-inch orthoimagery
The project
What the public record says
- ✓Gracewood Residential Community: 263 lots in phases 1 to 3A, 31 in phase 3BTown of Apex record: rezoning and planned-unit approval 17 October 2017; Technical Review Committee action 26 August 2021; master subdivision approved 8 September 2021; Town departments signed the phase 1 to 3A construction drawings between 24 November and 1 December 2025; the phase 3B drawings dated 28 August 2026 were unsigned when read. Status Under Construction in the Town's development layer on 14 October 2026.
- ✓Five lots, 232.67 deed acres, 0 Old US 1 HwyWake County PINs 0619195835 (129.85 ac), 0710117061 (44.84), 0619392823 (22.63), 0619172760 (19.82) and 0700906725 (15.53): lots 1 to 5 of Book of Maps 2026-00132, deed of 29 December 2022, Buckhorn township. Outlined in red in the imagery below; the Town's development boundary is in white.
- ✓Public infrastructure on the Town-signed cover sheet16,973 linear feet of new public streets, 24,770 of water line, 15,865 of sewer line, 23,255 of public storm drain, 34,373 of curb and gutter and 34,190 of sidewalk and greenway for phases 1 to 3A, per the construction-drawing cover by CE Group, Inc., revised 19 November 2025.
- ✓Reported sale, February 2026Hoodline, 17 February 2026, citing the News and Observer: about 233 acres on Old US 1 bought by a national home builder for about $59 million, with 444 homes planned and first homes expected late 2026. The county's owner of record had not changed on 14 October 2026, and the Town's November 2025 cover sheet names the same five owner entities and a Raleigh developer.
- JMS scopeConfirm with JMSJMS's two posts of 6 October 2025, tagged Apex, North Carolina, show "one of three large culvert crossings at the new Grace Woods project in Apex". Who built the crossings, the rest of JMS's scope and the client are JMS's to state.
Owner / developer
Five owner entities and a Raleigh developer are named on the Town-signed cover sheet; the owner of record for all five lots is on file. The press report names a national home builder as buyer. Client name pending consent
Approving authority
Town of Apex: Planning (Bruce Venable), Water Resources, Public Works and Transportation, Building Inspections, Electric, Fire, and Parks, each signed on the cover sheet. Engineer of record CE Group, Inc., Raleigh.
In the public record
Apex Development Report (30 September 2026) and the Town's Development in Apex map layer; the Town-signed construction-drawing cover; Wake County parcels; Hoodline, 17 February 2026, citing the News and Observer. The record names the land, the owners and the engineer; JMS's role on the site is stated by JMS.
Sources
Town of Apex development layer, report and plan cover · Wake County parcels · NC OneMap orthoimagery · NASA Harmonized Landsat Sentinel-2 · JMS Site Development on Instagram.
Before and after
Drag, or scroll, to move time
February 2025 at 6-inch resolution on the left; October 2026 from orbit on the right. The handle moves with the page as you scroll, or drag it, or use the arrow keys.

Right-hand image is NASA's 30-meter satellite composite, the only public 2026 overhead imagery today. A purchased 30-centimeter frame replaces it when JMS approves the project page.
Before
The same 233 acres, three winters apart.
State 6-inch orthoimagery flown on 4 February 2017, 17 February 2021 and 14 February 2025 (dates from the state service's tile records). Red outlines: the five lots. White outline: the Town's development boundary for phases 1 to 3A and 3B.



From orbit, 2025 to 2026
Roads show up from orbit.
NASA's Harmonized Landsat and Sentinel-2 imagery at 30 meters, every two to five days, cloud permitting. Of 268 dates probed between September 2024 and October 2026, 104 returned a frame and 65 are cloud-free over the tract; six are shown. Tan is cleared earth, green is canopy. The captions are our readings of the frames, not the record.