NC General Contractor License No. 104748License No. 104748·Unlimited·Angier, North Carolina·(919) 414-2255

Angier, North CarolinaNC GC License 104748 · Unlimited

Site work done right, from below grade up

A licensed site work contractor: mass grading, water, sewer and storm, road widening and subdivision site development, self-performed for developers, builders and general contractors in Wake, Johnston and Harnett counties.

Aerial view of a new subdivision road with stone base, a dump truck and a dozer, Zebulon, North Carolina Zebulon, NCRoad widening and stone base, February 2026

Prequalification at a glance

What your estimator needs, in one minute

The five things every prequalification form asks for. The packet goes out the same day it is requested.

  • ✓
    Licensed as JMS Site Dev, Inc.NC General Contractor License No. 104748 · Unlimited · Building; PU (water lines and sewer lines). Verify at portal.nclbgc.org
  •  
    Certificate of insuranceConfirm limits with JMSGeneral liability, auto and umbrella. COI issued to your project on request.
  •  
    Surety letterConfirm with JMSSingle and aggregate bonding capacity stated by our surety, dated within 30 days, on request.
  •  
    Safety recordConfirm with JMSThree-year EMR, OSHA 300A summaries and written safety program on request.
  • ✓
    Project referencesCompleted and in-progress projects with owner and GC contacts, on request. Public examples below.

Prequalification packet (COI, surety letter, EMR, OSHA 300A, W-9): tick the box on the bid form or call (919) 414-2255.

Self-performed scopes

Clearing and grubbing · mass grading · erosion control · storm drainage · water and sewer · force main · road widening and stone base · pond conversions and outlet structures · commercial pads and laydown yards

Equipment

Cat excavators including the 320, Cat D5 dozers, wheel loaders and dump trucks, roughly half new and half used, serviced on site by Gregory Poole Equipment Company since 2020. Full equipment list on request.

Service area

Wake, Johnston and Harnett counties. Recent sites in Apex, Raleigh, Zebulon, Garner, Morrisville, Fuquay-Varina, Clayton, Smithfield, Four Oaks and Angier.

Company

JMS Site Dev, Inc., Angier, NC 27501 · owner Jared Shea · site-work operations since 2020 · grading and utility crews under one roof.

What we do

The work under every development

Scopes we self-perform on residential and commercial sites.

01

Mass grading and site preparation

Land clearing, cut and fill, mass grading to rough grade, fine grading and ditch shaping to plan.

02

Underground utilities

Licensed utility contractor, PU (water lines and sewer lines): water main, sewer, storm drain and force main, water and sewer taps and services, and underground detention systems.

03

Road widening and stone base

Road widening, stone placement and the utility work that runs with it.

04

Subdivision site development

Large residential tracts from raw land to finished lots, including a 170-lot community in Smithfield.

05

Pond conversions and outlet structures

Grading and pipe on stormwater pond conversions, with new outlet structures set to plan.

06

Commercial site work

Pad grading, entrances and stone for commercial lots and laydown yards.

Projects map

Three counties, one yard

Crews leave Angier every morning for sites across Wake, Johnston and Harnett counties. Each project gets a page and a white paper built from public records; Smithfield and Gracewood are the first two.

Every town below appears on the map; the same list is in the table further down.

  • Apex Gracewood culvert crossings, 2025, with a project page and white paper; pond conversion and stone, curb and asphalt, 2022
  • Raleigh retaining wall and underground detention, 2025
  • Zebulon Hamilton project: demolition, road widening and stone base, 2025 to 2026
  • Garner six pond conversions, 2026
  • Morrisville commercial sewer, water and underground detention, 2026
  • Cary lot clearing for a commercial shop, 2022
  • Fuquay-Varina water main bore for a commercial facility, 2025; wet pond conversion, 2022
  • Clayton diversion ditches and a new outlet structure, 2025
  • Smithfield 170-lot community, 2026, with a project page and white paper
  • Four Oaks road widening, water services and mass grading, 2026
  • Selma water services for a townhome community, 2022
  • Angier our shop and laydown yard

Also: a pond conversion in Harnett County and sewer services in Johnston County, 2022, and the triple-barrel crossing at Cameron Crossings, 2025.

Projects map: Wake, Johnston and Harnett counties, North CarolinaJMS project towns from 2022 to 2026 and the Angier yard, one pin per town. Smithfield has a project page and white paper. The same list appears as text beside the map. WAKE JOHNSTON HARNETT Smithfield170-lot community ZebulonHamilton project Four OaksRoad widening and grading GarnerSix pond conversions MorrisvilleCommercial utilities ClaytonOutlet structure RaleighRetaining wall, 2025 ApexGracewood, 2025 CaryShop lot, 2022 Fuquay-VarinaWater main bore, 2025 SelmaTownhomes, 2022 AngierOur yard Project page and white paperProjectAngier yard

Recent work

The sites our crews have moved

Six of them below. The full list, 2022 to 2026, follows.

Crew and two excavators installing blue water pipe in a trench, Four Oaks
Four OaksWater services and ditches, Sep 2026
Excavator and dozer at a stone outlet structure beside new houses, Garner
GarnerSix pond conversions, Mar 2026
Excavator setting a precast structure with crew and pipe on site
Johnston CountyUtilities ahead of mass grading, Sep 2026
Aerial view of land clearing with an excavator loading a dump trailer, Smithfield
SmithfieldClearing for a 170-lot community, Aug 2026
Excavator on a cleared utility corridor with a red clay ditch
Force main corridorForce main and water main, Jun 2026
Loader and dump truck on a curving new road with stone base, Zebulon
ZebulonRoad widening and stone, Feb 2026
ProjectCountyScopeYearOwner / GC
Hamilton Project, ZebulonWakeDemolition, road widening, stone base, utilities2025 to 2026On request
170-lot community, SmithfieldJohnstonClearing, mass grading and site development for 170 lots2026On request
Four Oaks subdivisionJohnstonRoad widening, water services and mass grading2026On request
Garner pond conversionsWakeSix stormwater pond conversions: grading, pipe and outlet structures2026On request
Morrisville commercial siteWakeSewer, water, underground detention2026On request
Raleigh retaining wall and detentionWakeRetaining wall and underground detention system2025On request
Gracewood (Grace Woods), ApexWakeThree large culvert crossings2025On request
Cameron CrossingsOn requestTriple-barrel culvert crossing2025On request
Fuquay-Varina commercial facilityWakeWater main bore2025On request
Clayton outlet structureJohnstonDiversion ditches, roadways, backfill and a new outlet structure2025On request
Earlier work, 2022Wake, Johnston, HarnettPond conversions in Fuquay-Varina, Apex and Harnett County; lot clearing in Cary; water services in Selma; sewer services in Johnston County; stone, curb and asphalt in Apex2022On request

Contract values, completion dates and the share self-performed are in the prequalification packet. Project names and dates are as JMS posted them; owner and general contractor names are given on request. Owner and GC names pending client consent

State aerial of the Smithfield tract, February 2025, before clearing
Feb 2025, before
Satellite frame of the Smithfield tract, May 2026, clearing begins
May 2026, clearing
Satellite frame of the Smithfield tract, September 2026
Sep 2026, grading

Site tracking

Watch your site move

Every JMS project page follows the ground from public imagery: the state's 6-inch aerials before we arrive, satellite frames each season while we work, and our own drone on the day. A developer or lender can check progress without a site visit.

See the Smithfield timeline

How a bid works

Plans in. Crews out

Send the plans

PDF or a plan-room link, the scope you need priced, and the bid date.

Takeoff and bid

Our estimator quantifies the dirt and the pipe and returns a bid with the prequalification packet.

Mobilise from Angier

Cat iron and crews roll from our yard; the dealer services on site.

Dirt and pipe, one contractor

Grading and utilities under one contract, from raw land to pad-ready.

Straight answers

What buyers ask before they send plans

Mass grading or rough grading?
Mass grading is the bulk cut and fill that shapes a whole tract to the grading plan. Rough grading brings each pad and road to within a few tenths of design, and fine grading finishes it. We self-perform all three.
Who installs water and sewer taps in Wake County?
Towns such as Apex require a private licensed utility contractor for taps and service connections. Our license carries the PU classification for water lines and sewer lines; verify it at portal.nclbgc.org.
What does a site work bid need?
The plan set or a plan-room link, the scope you want priced, the bid date and whether bonding is required. Our estimator returns a takeoff-based bid with the prequalification packet.
What is a pond conversion?
At the end of a subdivision's build-out, the temporary sediment basin becomes the permanent stormwater pond on the approved plans: regrading, the outlet structure, pipe and stabilization. We converted six in Garner in 2026.
Do you work outside Wake, Johnston and Harnett counties?
Our crews leave Angier every morning, so those three counties are where we bid. Ask about a neighboring county on a larger package.

Request a bid

Send us the plans

Plans, the scope you need priced and a due date are enough. Our estimator replies by phone or email.

Scope to price
Bonding required?
Reply by
Straight to our estimator. No mailing list.

Or call the office.

(919) 414-2255

JMS Site Dev, Inc.
Angier, NC 27501

NC General Contractor License No. 104748, Unlimited.

Capabilities statement (PDF)

Follow the work on Instagram.

Every morning starts in Angier

A new yard, a new shop, the same crews

In 2026 we moved into a new shop and laydown yard in Angier. The fleet leaves from here every morning for sites across the Triangle.

  • Shop and laydown yard in Angier, Harnett County, opened in 2026.
  • Mixed Cat fleet of excavators and dozers, roughly half new and half used, with dealer service on the job site.
  • Grading and utility crews under one roof, with materials stocked in our own shop.
Talk to us about a site

Join the crew. Operators, pipe crews and CDL drivers: apply here or call (919) 414-2255. Confirm openings with JMS

Dawn aerial of the JMS building in Angier, a dark steel building with a light roof and a landscaped concrete entrance drive
Inside the JMS shop in Angier: a lit steel building with racking, pipe and equipment

What partners say

Built on iron that shows up

“Certainly, as we continue to grow, we will continue working with Gregory Poole. They’ve been a huge help to us.”
Jared Shea, owner, in Gregory Poole Equipment Company’s customer story, November 2024