Angier, North CarolinaNC GC License 104748 · Unlimited
Site work done right, from below grade up
A licensed site work contractor: mass grading, water, sewer and storm, road widening and subdivision site development, self-performed for developers, builders and general contractors in Wake, Johnston and Harnett counties.

Prequalification at a glance
What your estimator needs, in one minute
The five things every prequalification form asks for. The packet goes out the same day it is requested.
- ✓Licensed as JMS Site Dev, Inc.NC General Contractor License No. 104748 · Unlimited · Building; PU (water lines and sewer lines). Verify at portal.nclbgc.org
- Certificate of insuranceConfirm limits with JMSGeneral liability, auto and umbrella. COI issued to your project on request.
- Surety letterConfirm with JMSSingle and aggregate bonding capacity stated by our surety, dated within 30 days, on request.
- Safety recordConfirm with JMSThree-year EMR, OSHA 300A summaries and written safety program on request.
- ✓Project referencesCompleted and in-progress projects with owner and GC contacts, on request. Public examples below.
Prequalification packet (COI, surety letter, EMR, OSHA 300A, W-9): tick the box on the bid form or call (919) 414-2255.
Self-performed scopes
Clearing and grubbing · mass grading · erosion control · storm drainage · water and sewer · force main · road widening and stone base · pond conversions and outlet structures · commercial pads and laydown yards
Equipment
Cat excavators including the 320, Cat D5 dozers, wheel loaders and dump trucks, roughly half new and half used, serviced on site by Gregory Poole Equipment Company since 2020. Full equipment list on request.
Service area
Wake, Johnston and Harnett counties. Recent sites in Apex, Raleigh, Zebulon, Garner, Morrisville, Fuquay-Varina, Clayton, Smithfield, Four Oaks and Angier.
Company
JMS Site Dev, Inc., Angier, NC 27501 · owner Jared Shea · site-work operations since 2020 · grading and utility crews under one roof.
What we do
The work under every development
Scopes we self-perform on residential and commercial sites.
Mass grading and site preparation
Land clearing, cut and fill, mass grading to rough grade, fine grading and ditch shaping to plan.
Underground utilities
Licensed utility contractor, PU (water lines and sewer lines): water main, sewer, storm drain and force main, water and sewer taps and services, and underground detention systems.
Road widening and stone base
Road widening, stone placement and the utility work that runs with it.
Subdivision site development
Large residential tracts from raw land to finished lots, including a 170-lot community in Smithfield.
Pond conversions and outlet structures
Grading and pipe on stormwater pond conversions, with new outlet structures set to plan.
Commercial site work
Pad grading, entrances and stone for commercial lots and laydown yards.
Projects map
Three counties, one yard
Crews leave Angier every morning for sites across Wake, Johnston and Harnett counties. Each project gets a page and a white paper built from public records; Smithfield and Gracewood are the first two.
Every town below appears on the map; the same list is in the table further down.
- Apex Gracewood culvert crossings, 2025, with a project page and white paper; pond conversion and stone, curb and asphalt, 2022
- Raleigh retaining wall and underground detention, 2025
- Zebulon Hamilton project: demolition, road widening and stone base, 2025 to 2026
- Garner six pond conversions, 2026
- Morrisville commercial sewer, water and underground detention, 2026
- Cary lot clearing for a commercial shop, 2022
- Fuquay-Varina water main bore for a commercial facility, 2025; wet pond conversion, 2022
- Clayton diversion ditches and a new outlet structure, 2025
- Smithfield 170-lot community, 2026, with a project page and white paper
- Four Oaks road widening, water services and mass grading, 2026
- Selma water services for a townhome community, 2022
- Angier our shop and laydown yard
Also: a pond conversion in Harnett County and sewer services in Johnston County, 2022, and the triple-barrel crossing at Cameron Crossings, 2025.
Recent work
The sites our crews have moved
Six of them below. The full list, 2022 to 2026, follows.






| Project | County | Scope | Year | Owner / GC |
|---|---|---|---|---|
| Hamilton Project, Zebulon | Wake | Demolition, road widening, stone base, utilities | 2025 to 2026 | On request |
| 170-lot community, Smithfield | Johnston | Clearing, mass grading and site development for 170 lots | 2026 | On request |
| Four Oaks subdivision | Johnston | Road widening, water services and mass grading | 2026 | On request |
| Garner pond conversions | Wake | Six stormwater pond conversions: grading, pipe and outlet structures | 2026 | On request |
| Morrisville commercial site | Wake | Sewer, water, underground detention | 2026 | On request |
| Raleigh retaining wall and detention | Wake | Retaining wall and underground detention system | 2025 | On request |
| Gracewood (Grace Woods), Apex | Wake | Three large culvert crossings | 2025 | On request |
| Cameron Crossings | On request | Triple-barrel culvert crossing | 2025 | On request |
| Fuquay-Varina commercial facility | Wake | Water main bore | 2025 | On request |
| Clayton outlet structure | Johnston | Diversion ditches, roadways, backfill and a new outlet structure | 2025 | On request |
| Earlier work, 2022 | Wake, Johnston, Harnett | Pond conversions in Fuquay-Varina, Apex and Harnett County; lot clearing in Cary; water services in Selma; sewer services in Johnston County; stone, curb and asphalt in Apex | 2022 | On request |
Contract values, completion dates and the share self-performed are in the prequalification packet. Project names and dates are as JMS posted them; owner and general contractor names are given on request. Owner and GC names pending client consent



Site tracking
Watch your site move
Every JMS project page follows the ground from public imagery: the state's 6-inch aerials before we arrive, satellite frames each season while we work, and our own drone on the day. A developer or lender can check progress without a site visit.
See the Smithfield timelineHow a bid works
Plans in. Crews out
Send the plans
PDF or a plan-room link, the scope you need priced, and the bid date.
Takeoff and bid
Our estimator quantifies the dirt and the pipe and returns a bid with the prequalification packet.
Mobilise from Angier
Cat iron and crews roll from our yard; the dealer services on site.
Dirt and pipe, one contractor
Grading and utilities under one contract, from raw land to pad-ready.
Straight answers
What buyers ask before they send plans
- Mass grading or rough grading?
- Mass grading is the bulk cut and fill that shapes a whole tract to the grading plan. Rough grading brings each pad and road to within a few tenths of design, and fine grading finishes it. We self-perform all three.
- Who installs water and sewer taps in Wake County?
- Towns such as Apex require a private licensed utility contractor for taps and service connections. Our license carries the PU classification for water lines and sewer lines; verify it at portal.nclbgc.org.
- What does a site work bid need?
- The plan set or a plan-room link, the scope you want priced, the bid date and whether bonding is required. Our estimator returns a takeoff-based bid with the prequalification packet.
- What is a pond conversion?
- At the end of a subdivision's build-out, the temporary sediment basin becomes the permanent stormwater pond on the approved plans: regrading, the outlet structure, pipe and stabilization. We converted six in Garner in 2026.
- Do you work outside Wake, Johnston and Harnett counties?
- Our crews leave Angier every morning, so those three counties are where we bid. Ask about a neighboring county on a larger package.
Request a bid
Send us the plans
Plans, the scope you need priced and a due date are enough. Our estimator replies by phone or email.
Or call the office.
(919) 414-2255JMS Site Dev, Inc.
Angier, NC 27501
NC General Contractor License No. 104748, Unlimited.
Follow the work on Instagram.
Every morning starts in Angier
A new yard, a new shop, the same crews
In 2026 we moved into a new shop and laydown yard in Angier. The fleet leaves from here every morning for sites across the Triangle.
- Shop and laydown yard in Angier, Harnett County, opened in 2026.
- Mixed Cat fleet of excavators and dozers, roughly half new and half used, with dealer service on the job site.
- Grading and utility crews under one roof, with materials stocked in our own shop.
Join the crew. Operators, pipe crews and CDL drivers: apply here or call (919) 414-2255. Confirm openings with JMS


What partners say
Built on iron that shows up
“Certainly, as we continue to grow, we will continue working with Gregory Poole. They’ve been a huge help to us.”


On the job this year
Follow the work
Drone updates from live sites, straight from our Instagram.